PROJECTS

New three storied commercial office
building, constructed on a tight inner
city site. This project has 40T of steel
including 350WC230 and 400WC212
portal frames, along with feature
steel framed facade and canopy.

New two storied commercial office
complex, with 26T of steel
including 108m of 610UB101
beams with rafters. This project
involved site welding of rafters to
large weld plates and the lifting of
the lift shaft portal in one piece.

This project involves 10T of steelwork
in constructing the 500m2 office/retail
building with 36m of 610UB101
beams, as well as metalwork louvres.

Structural strengthening project of 30
existing shops down this historic
street including fitting in 200UC52
portal frames to front of buildings,
supplying and installing floor joist
brackets, and roof brackets.

Structural strengthening of inner
city office and retail space, with
large intricate 310UC118 and
460UB75 facade portals to both
High and Hereford Streets, and
fitting bracing into existing roof
space.

Structural strengthening of existing
historical building, plated 250UC73
portal frames to ground floor and
310UB40 portals to first floor all
through narrow access way into
building.

544 JOHNS ROAD, HAREWOOD, CHRISTCHURCH, NZ | PHONE: 03 348 8852 | FAX: 03 348 8856 | EMAIL: INFO@E4ENGINEERING.CO.NZ